Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | 12months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The PET Strap Making Machine is a highly advanced and reliable automation equipment for producing PET straps. It is equipped with a PLC control system, double cylinder/single cylinder, and SIMENS motor, and is capable of running with a strap speed of up to 250m/min. It offers remarkable precision with an error of width within 0.2mm, and is suitable for producing PET straps of various widths, from 9mm to 32mm, with an adjustable strap tension ranging from 150 to 850kg. With its advanced technology and outstanding performance, the PET Strap Making Machine is widely used in various industries and applications.
Item | Name | Q'ty |
1 | Dehumidification and drying system | 1 set |
2 | Oil and dust filter | 1 set |
3 | Horizontal mixer(2500L) | 1 set |
4 | Pre-drying tower(3000L) | 1 set |
5 | Screw Feeder | 3 set |
6 | Barrel(3000L) | 1 set |
7 | ¢90mm Extruding Machine | 1 set |
8 | Melt pump | 1 set |
9 | Single cylinder filter | 1 set |
10 | PET Mould output 2straps | 1 set |
11 | Cooling water tank | 1 set |
12 | Stretching oven | 1 set |
13 | Five roller gearbox | 3 set |
14 | PLC electrical control system | 1 set |
15 | Forming oven | 1 set |
16 | Double disk winder | 2 set |
This machine is mainly used to make PET strap
Our machines adopts the PLC control to realsize the whole line auotmatic production.
Using the melting pump and pressure sensor ensure the production stable and strap quality control.
The raw material can be 100% recycled pet flakes from the waste pet bottles,or virgin material or mixed with each other.
1.WHY CHOOSE US
We are the Professional manufacturer to develop the plastic extrusion machines in Shenzhen. Machine quality and customer satisfaction is our pursuit.Be sure we have the strength to provide you with quality machines and perfect service.
2.WHAT SERVICES DO WE OFFER?
Pre-sale communication → Design proposal, signature confirmation→Customized production→ Test machine before shipment →Package &
delivery→ Engineer installation→Training operator → Technical support
3.PAYMENT TERMS:
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).
4.DELIVERY CONDITIONS:
4.1 Delivery condition: FOB Shenzhen port or CIF destination Port.
4.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.